I am working on a project which will require a 2.75" slab poured over an existing post tensioned slab inside a building. The new slab will have astro turf bonded to the top and work out sleds with weights will be pushed back and forth across the turf for work outs. Will a conventional concrete mix suffice for this type of installation or should I look at admixtures or a different spec? Thanks in advance.