I am in a Middle eastern country and about to make several concrete pours both flatwork and foundation. I would like for an "expert" to give me the proper mix for 4500# concrete with 90 mins from batch to site pour in 95-110 degree hot dry weather. I'm aware of the available admixtures but I need to confirm the mix that my subcontractor is proposing.